- Estimated Cost: $40.00
- Deposit: $40.00
- Max Trip Size: 24 people
Border Route Trail construction of several hundred yards of new trail on each side of the brook to connect to a new Portage Brook bridge site We hope to complete this Friday.
Removal and lowering into the water of the current bridge and floating it 100 yards downstream to the new shorter, higher and dryer bridge site. We will then install new aluminum support posts and jack the bridge up to the higher grade. Substantial completion on Saturday
We will re-nail and screw the bridge connections to tighten it up after 40 years of service. bring your hammer tool belt and/or screw gun for Torx head screws. Saturday and Sunday
As time permits, we will re-adjust the nearby Stump River Bridge to straighten several cross members. Sunday
Car Camping at the Otter Lake Hilton. Good swimming in Otter lake. Thursday or Friday evening arrivals at Otter lake. Breakfast, lunch and dinner Saturday and breakfast and lunch Sunday provided. Need car camping gear including tent, sleeping pad and bag, rain and bug protection. sturdy hiking boots, hat, work gloves, safety glasses, camera.